Go top
Project information

Efficiency of thermal units ABO1 and SRI3 in the solution of thermal constraints of distribution grid of Asturias

E. Lobato F.M. Echavarren L. Rouco

April 2024 - June 2024

Funding entity Aboño Generaciones Eléctricas, S.L.U


Assessment of the contribution of thermal unit ABO1 to the operation and reliability of distribution grid of Asturias.


Layman's summary: Assessment of the contribution of thermal unit ABO1 to the operation and reliability of distribution grid of Asturias



EDP_ABO1vsSRI3